Teamcenter services feedback from Globus Project

EXCERPT:

siemensenergy 300x140"[Teamcenter expert, Randy Ellsworth] performed exceptionally well and assumed the role of Infrastructure architect... A mixture of physical and virtual servers were stood up and configured as needed... Often work needed to be completed after hours and over weekends to meet the schedule without affecting normal business and solution development. After over two years, Randy successfully handed over the Infrastructure tasks to the team he mentored and transitioned out of the project.

The success of the Globus project was due in part to Randy’s participation. His knowledge and experience were instrumental while his cool demeanor during highly stressful events kept everyone at ease. I would gladly engage him again given the opportunity and provide my highest recommendation."

- Peter Spierling, Globus Project at Siemens Energy Oil & Gas

"The Globus Project was to consolidate Siemens Energy (Oil and Gas) engineering systems from several divisions into a single unified engineering system. The consolidation required data model changes, migration from current engineering systems, integration with Atlas (SAP) and multiple CAD systems. Project membership spiked around 80 people, composed mainly of Siemens AG representing the business and Siemens PLM Services representing the change agents. There were a handful of people that were outside contractors and one of those was Randy Ellsworth.

siemensenergy 300x140Randy joined the project in Finspang, SE (FSP) with no background and very little turnover as the Teamcenter administrator. At the time, the project consisted of twenty Teamcenter development environments running concurrently on a single Sun server. The cost of upgrading the Sun server was prohibitive to the growth of the project and everything was soon migrated to Windows tiered servers. Due to business reasons the project moved to Gorlitz, DE (GLZ).

While in GLZ, Randy performed exceptionally well and assumed the role of Infrastructure architect under the superb leadership of Peter Spierling. A mixture of physical and virtual servers were stood up and configured as needed to facilitate data migration using global services, several development environments, a quality assurance environment, a training environment and a production environment were maintained or rebuilt as required. The production environment, besides being separated vertically, was also expanded horizontally so that the application tier consisted of three servers and the web tier consisted of two servers behind a load-balancer to accommodate the load and fail over. Randy successfully mentored several people in his role and regularly scheduled tasks for them. Randy was instrumental in the successful “go live” rollout to Production of the Globus project for the GLZ business units then the project moved to Nurnberg, DE (NBG).

While in NBG, Randy mentored two more people in his infrastructure role while assigning tasks and keeping the project on schedule. At one point, the infrastructure totaled over 80 physical and virtual windows servers being maintained by the Infrastructure team. Randy worked directly with the project managers for the business, Ralf Domhoever, and Siemens PLM Services, Andreas Bellm while completing tasks assigned by the Infrastructure Team Lead, Peter Spierling. Randy directly worked with the Migration Team Lead to support their heavy usage and implement performance improvements for global services. Randy also directly worked with the Deployment Team Lead to ensure that templates, patches and system updates were performed regularly and without issue. Often work needed to be completed after hours and over weekends to meet the schedule without affecting normal business and solution development. After over two years, Randy successfully handed over the Infrastructure tasks to the team he mentored and transitioned out of the project.

The success of the Globus project was due in part to Randy’s participation. His knowledge and experience were instrumental while his cool demeanor during highly stressful events kept everyone at ease. I would gladly engage him again given the opportunity and provide my highest recommendation."

- Peter Spierling
GS IT PG CP DBG DM
Globus Project at Siemens Energy Oil & Gas

 


Make your next step, the best step...

Reach out to us about your project. We're engineers and we love to get into the details!

Reach out to us about your project. We're engineers and we love to get the details!

For fabrication requests, we will need the following details to provide cost estimates for you:

  • 3D CAD model available?
  • Drawing or PMI on model to convey desired feature tolerances available?
  • Desired material, special finishes/coatings, etc?
  • Quantity needed and desired delivery date?

Joomla Forms makes it right. Balbooa.com

Sherpa Design:
guiding others to success

Our Affiliated Partners

Our Address

6700 North New York Avenue
Suite 231
Portland, Oregon 97203
503-771-3570